Project Title |
Client / Donor |
Key Issues |
|
The technical consultation for Dinghui Temple Businesses Center |
Beijing Capital estate development corp. |
Investigation
and survey in the spot; Finishing the Water
Resources Argumentation Report , the Flood Impact Analysis
Report and the Water and Soil Conservancy Planning Report. |
|
The technical consultation for Bohai center grade school
extension project |
Government of Bohai town Beijing |
Investigation
and survey in the spot; Finishing the Water
Resources Argumentation Report and the Flood Impact Analysis
Report. |
|
Exterior Construction Condition
Analysis Report For Emergent Water
Supply Plan From Xiaolangdi Water
Reservoir To Beijing |
Project office of Emergent Water
Transfers for Xiaolangdi South-to-North
Water Transfers |
South-to-North Water
Transfers,
Analyze time
limit for the project construct
on the basis of
investigative result,
Make suggestions for
Exterior Construction Condition. |
|
Water Price Analysis For Emergent Water
Supply Plan from Xiaolangdi Water
Reservoir to Beijing |
Project office of Emergent Water
Transfers for Xiaolangdi South-to-North
Water Transfers |
South-to-North Water
Transfers,
Water Price Analysis for beijing and
tianjing,
Make befitting suggestions. |
|
Beiyun River---Master plan for Water
view in Wuqing area of Tianjing city |
Government of Wuqing area of Tianjing
city |
Reconnaissance, discuss, communication
and consult in the spot; Provide the
riverside sight seeing and water view
training to the technical in Wuqing
area Government; Make suggestions for
riverside view & sightseeing spot plan. |
|
Appraisal of
Irrigation Computer Management Model |
Department of Irrigation management,
Ministry of Water Resources |
Undertake the investigation of computer
technology used in China and abroad,
Provision the suggestion on the IT
technology used in irrigation
management;
Appraisal the feasibility and actual
operation.
|
|
The study of reform and management for
water resources management Institution
in eleventh five year plan |
Ministry of Water Resources, China |
Through the study the capacity and
function of the Institutions in the
water resources; Provide the suggestion
on the management reform and capacity
strengthening. |
|
Management Consulting Project for South
to North Water Transfer Project |
Bureau of water Transter Ministry of
Water Resources, China |
Provide the advice to Management for
the South to North transfer project in
the project preparation. |
|
Dalangzhi Hydropower Station |
Jianghe Rural Electricity Development
Co., Ltd |
Review the dam designing and dam
safety; Evaluation of the geology
condition of dam site and tunnel line;
Recommend the technology options ;
Consult the resettlement program and
action plan. |
|
Lazhai Hydropower Station |
China Water Investment Corp. |
Review the dam designing and dam
safety. Evaluation of the geology
condition of dam site. Management of
Social environment impact of the dam.
Management of resettlement program and
action plan. |
|
Yangtze & Pearl Watershed
Rehabilitation Project |
Foreign Investment Management Office,
Ministry of Water Resources/World Bank
PHRD |
Undertake the investigation of water
and soil erosion, Provide the
suggestion on the water soil erosion
controlling technology,
Appraisal the feasibility of
introducing economic trees and garden. |
|
Shimenzi RCC Dam Takeover Consulting
Service |
Xinjiang Water Resources Department |
Review the dam designing and dam
safety. Evaluation of the geology
condition of dam site and hydropower
installation capacity. Analyze the
resettlement program and action plan.
|
|
Evaluation of detailed Technical design
for Mongolia Durgan hydropower station. |
China Shanghai Foreign Economic
Development Corp, China/Ministry of
infrastructure, Mongolia |
Review the earth dam designing.
Calculate the Station operation Model;
Assess the Social environment impact of
the dam, Analyze the resettlement
program and action plan. |
|
Wuzhou Water supply Project Turnover
Consulting Service |
Wuzhou City Government |
Review the financial & economic
situation of project, Evaluation
of the turnover condition of water
supply company, Recommend the turnover
options in the bidding process. |
|
Flood impact analysis of Hunnan Golf
Yard project |
Shenyang city Government & Korea
Industry Investment Corp. |
Calculate the flood impact area by the
hydrological model, Analyze the
environment impact of the Golf project
Suggest the complementarily projects.
|
|
National Flood Control & Drought Relief
Commanding System Project (I) |
State General Office for Flood Control
& Drought Relief /Ministry of Water
Resources |
Review the general planning of the
project; Undertake the consulting work
in the project preparation;
Make the study for the project in flood
decision support and warning system.
|
|
Longshou RCC Arch Dam Safety Evaluation |
Water Resources Department Heilongjiang
Province |
Review the dam design, Collect dam
historical data . Assess the Social
impact of the reservoir function
transferring. Make suggestion for the
dam safety management. |
|
Chalinhe Hydropower Station
|
Chalinhe Hydropower Development Corp. |
Review the dam designing and dam
safety. Recommend the technology
options. Management of the Social
environment impact of the dam. Review
the construction plan of the project. |
|
Flood impact analysis to Germu
city |
Germu city government, China |
Calculate the flood impact area by the
hydrological model; Provide the impact
of flood and measures of flood control. |
|
Evaluation of Preliminary design for
Congo Imbulou hydropower station
|
China Machine Import & Export Corp./
Congo Government |
Review the dam designing and dam
safety, Evaluation of the geology
condition. Assess the Social
environment impact of the dam,
Reviewing the construction plan. |
|
Preliminary design Review for Imboulou
hydropower station |
China Machinery Import &Export
Corp Congo Government |
Review the permeation proof earth dam
designing. Evaluate the hydroelectric
equipment installation. Analyses the
resettlement program and action plan. |
|
Ecological landscape planning of Willow
Island in Jiamusi city |
Jiamusi City Government |
Provide the advice and suggestion to
social impact for the local people;
Make the business plan and marketing
strategy for the Island. |
|
Yangtze River Dike Strengthening
Project |
Yangtze River Water Resources
Commission/ World Bank |
Provide the suggestion on the flood
management strengthening measures.
Present the suggestion report to the
provincial institution capacity
building and training plans.
|
|
Ecological landscape planning of Yanan
Baota District |
Yanan City Government |
Make out the general plan of the
district; Provide the advice to
ecological preservation.
Organize the review meeting; Present
the suggestion tourism development,
business plan, marketing strategy. |
Irrigated Agriculture Intensified Loan
(II)&(III) |
State Comprehensive Agriculture
Development Office/ World Bank |
Provide the suggestion on the dam
management and dam safety,
Calculate the water resources balance
in the project area, Evaluate and
review the project proposal and FS for
the project provinces. |
Water Saving Irrigation Project
(I) &(II) |
Irrigation & Drainage Management
Centre, Ministry of Water Resources |
Study police of promoting the water
saving technology,
Review the computer management options
and technology plan, Evaluate and
review water saving technology options
in the project. |
|
Hydrological calculation for section
of Liusha Island in Songhua River. |
Department of Water Resources
Heilongjiang province. |
Map out the development of flood
control & drainage projects in the
city. Calculate the flood impact area
and control project planning.
Evaluate the flood and water log impact
to the normal life in the urban & rural
area. |
|
Flood Control & drainage project
planning for Maoning city, Guangdong
province. |
Government of Maoning city, China
|
Calculating the water surface line by
STREAM model. Provision suggestion on
the flood control project planning.
|
|
Shapu River Reservoir water supply
project |
Guangxi Liuzhou Integrated Investment
company |
Appraise the feasibility of supplying
water to the city from Shapu River,
Confirm the program of agriculture
irrigation compensating, Map out the
program of water transfer pipeline;
Estimate the total project investment. |
|
The feasibility study for Yicheng city
water supply of Xuancheng city in
Hubei. |
China water investment corp. |
Study the water resources balance of
Han River. Appraise the feasibility of
the project, Make suggestion to the
business plan and marketing reform
program. The consulting service of
resettlement program. |
|
The Feasibility Consulting for Yanan
Urban Water Supply project. |
China Water Investment Corp |
Make reviewing and evaluation for the
Wangyao Reservoir¨s feasibility study.
Undertake the optimizing design for
Wangyao dam; Make reviewing and
evaluation for the water pipeline
design. |