The technical consultation for Dinghui Temple Businesses Center Beijing Capital estate development corp. Investigation and survey in the spot;  Finishing the Water Resources Argumentation Report , the Flood Impact Analysis Report and  the Water and Soil Conservancy Planning Report.
The technical consultation for Bohai center grade school extension project Government of Bohai town Beijing Investigation and survey in the spot;  Finishing the Water Resources Argumentation Report and the Flood Impact Analysis Report.
Exterior Construction Condition Analysis Report For Emergent Water Supply Plan From Xiaolangdi Water Reservoir To Beijing Project office of Emergent Water  Transfers for Xiaolangdi South-to-North Water Transfers South-to-North Water Transfers, Analyze time limit for the project  construct on the basis of investigative result, Make suggestions for Exterior Construction Condition.
Water Price Analysis For Emergent Water Supply Plan from Xiaolangdi Water Reservoir to Beijing Project office of Emergent Water  Transfers for Xiaolangdi South-to-North Water Transfers South-to-North Water Transfers, Water Price Analysis for beijing and tianjing, Make befitting suggestions.

Beiyun River---Master plan for Water view in Wuqing area of Tianjing city

Government of Wuqing area of Tianjing city

Reconnaissance, discuss, communication and consult in the spot; Provide the riverside sight seeing and water view training to the technical in Wuqing area Government; Make suggestions for riverside view & sightseeing spot plan.

Appraisal of Irrigation Computer Management Model

 Department of Irrigation management, Ministry of Water Resources

Undertake the investigation of computer technology used in China and abroad, Provision the suggestion on the IT technology used in irrigation management; Appraisal the feasibility and actual operation.  

The study of reform and management for water resources management  Institution in eleventh five year plan Ministry of Water Resources, China Through the study the capacity and function of the Institutions in the water resources; Provide the suggestion on the management reform and capacity strengthening.
Management Consulting Project for South to North Water Transfer Project Bureau of water Transter Ministry of Water Resources, China Provide the advice to Management for the South to North transfer project in the project preparation.
Dalangzhi Hydropower Station Jianghe Rural Electricity Development Co., Ltd

Review the dam designing and dam safety; Evaluation of the geology condition of dam site and tunnel line; Recommend the technology options ; Consult the resettlement program and action plan.

Lazhai Hydropower Station China Water Investment Corp.

Review the dam designing and dam safety. Evaluation of the geology condition of dam site. Management of Social environment impact of the dam. Management of resettlement program and action plan.

Yangtze & Pearl Watershed Rehabilitation Project Foreign Investment Management Office, Ministry of Water Resources/World Bank PHRD

Undertake the investigation of water and soil erosion, Provide the suggestion on the water soil erosion controlling technology, Appraisal the feasibility of introducing economic trees and garden.

Shimenzi RCC Dam Takeover Consulting Service Xinjiang Water Resources Department

Review the dam designing and dam safety. Evaluation of the geology condition of dam site and hydropower installation capacity. Analyze the resettlement program and action plan.

Evaluation of detailed Technical design for Mongolia Durgan hydropower station.

China Shanghai Foreign Economic Development Corp, China/Ministry of infrastructure, Mongolia

Review the earth dam designing.  Calculate the Station operation Model; Assess the Social environment impact of the dam,  Analyze the resettlement program and action plan.

Wuzhou Water supply Project Turnover Consulting Service Wuzhou City Government

Review the financial & economic situation of project,  Evaluation of the turnover condition of water supply company, Recommend the turnover options in the bidding process.

Flood impact analysis of Hunnan Golf Yard project Shenyang city Government & Korea Industry Investment Corp.

Calculate the flood impact area by the hydrological model,  Analyze the environment impact of the Golf project Suggest the complementarily projects.

National Flood Control & Drought Relief Commanding  System Project (I) State General Office for Flood Control & Drought Relief /Ministry of Water Resources

Review the general planning of the project; Undertake the consulting work in the project preparation;  Make the study for the project in flood decision support and warning system.

Longshou RCC Arch Dam Safety Evaluation Water Resources Department Heilongjiang Province

Review the dam design, Collect dam historical data . Assess the Social impact of the reservoir function transferring. Make suggestion for the dam safety management.

Chalinhe Hydropower Station Chalinhe Hydropower Development Corp.

Review the dam designing and dam safety.  Recommend the technology options.  Management of the Social environment impact of the dam. Review the construction plan of the project.

Flood impact analysis to Germu city

Germu city government, China

Calculate the flood impact area by the hydrological model; Provide the impact of flood and measures of flood control.

Evaluation of Preliminary design for Congo Imbulou hydropower station China Machine Import & Export Corp./ Congo Government

Review the dam designing and dam safety, Evaluation of the geology condition. Assess the Social environment impact of the dam, Reviewing the construction plan.

Preliminary design Review for Imboulou hydropower station

China Machinery Import &Export Corp Congo Government

Review the permeation proof earth dam designing. Evaluate the hydroelectric equipment installation. Analyses the resettlement program and action plan.

Ecological landscape planning of Willow Island in Jiamusi city Jiamusi City Government

Provide the advice and suggestion to social impact for the local people; Make the business plan and marketing strategy for the Island.

Yangtze River Dike Strengthening Project Yangtze River Water Resources Commission/ World Bank

Provide the suggestion on the flood management strengthening measures.  Present the suggestion report to the provincial institution capacity building and training plans.

Ecological landscape planning of Yanan Baota District Yanan City Government

Make out the general plan of the district; Provide the advice to ecological preservation. Organize the review meeting; Present the suggestion tourism development, business plan, marketing strategy.

Irrigated Agriculture Intensified Loan
(II)&(III)
State Comprehensive Agriculture Development Office/ World Bank

Provide the suggestion on the dam management and dam safety, Calculate the water resources balance in the project area,  Evaluate and review the project proposal and FS for the project provinces.

Water Saving Irrigation Project
(I) &(II)
Irrigation & Drainage Management Centre, Ministry of Water Resources

Study police of promoting the water saving technology, Review the computer management options and technology plan, Evaluate and review water saving technology options in the project.

Hydrological calculation for section of Liusha Island in Songhua River.

Department of Water Resources Heilongjiang province.

Map out the development of flood control & drainage projects in the city. Calculate the flood impact area and  control project planning. Evaluate the flood and water log impact to the normal life in the urban & rural area.

Flood Control & drainage project planning for Maoning city, Guangdong province. Government of Maoning city, China

Calculating the water surface line by STREAM model. Provision suggestion on the flood control project planning.

Shapu River Reservoir water supply project Guangxi Liuzhou Integrated Investment company

Appraise the feasibility of supplying water to the city from Shapu River, Confirm the program of agriculture irrigation compensating, Map out the program of water transfer pipeline; Estimate the total project investment.

The feasibility study for Yicheng city water supply of Xuancheng city in Hubei.

China water investment corp.

Study the water resources balance of Han River. Appraise the feasibility of the project, Make suggestion to the business plan and marketing reform program. The consulting service of resettlement program.

The Feasibility Consulting for Yanan Urban Water Supply project. China Water Investment Corp

Make reviewing and evaluation for the Wangyao Reservoir¨s feasibility study. Undertake the optimizing design for Wangyao dam; Make reviewing and evaluation for the water pipeline design.

 

 

 

 

 

 

 

 

 

 

 

 

Add: No.12, Lane 2, Baiguang Road, Xuanwu District, Beijing, China      Post code: 100053
Tel: 86-10-63581188-2215    Fax: 86-10-83547572
E-mail: postmaster@riverengineers.com.cn

       
PROJECTS

PARTNER

OPPORTUNITIES