HOMEABOUT USNEWSSERVICESCONTACT
 

   On-going  Projects

 

 

Project Title

Client / Donor

Key Issues

The budget management regulation study of South-to-North Water Transfer Project Bureau of South-to-North Water Transfer, the Central People's Government of P. R. China Discuss the problems on the budget management of South-to-North Water Transfer Project; Provide the advice to ^The Static Control & Dynamic Manage Stratagem ̄ of the budget management of South-to-North Water Transfer Project.
The cost reviewing and recalculation of Feasibility Study and Preliminary Design for South-to-North Water Transfer Project Yangtze River Water Resources Commission, Ministry of Water Resources of P.R. of China Undertake cost reviewing and recalculation of South-to-North Water Transfer Project¨s Feasibility study and Preliminary Design; Investigate and ascertain the overlap workload of the different investigation and design work phases (From 1992 to Present).
The law & regulation study of  South-to-North Water Transfer Project Bureau of South-to-North Water Transfer Planning & Design, Ministry of Water Resources of P.R. of China Discuss the problems on the law & statute of South-to-North Water Transfer Project; Gives the suggestion on perfecting the current law & statute system of South-to-North Water Transfer Project; Provide the advice to the government policy-making department.
The risk and social impact of Lihuangang Flood Control Project Huaihe River Commission Ministry Of Water Resources, P. R. China analysis for the necessity and the feasibility about coming water of Linhuaigang engineering; Proposed appropriate plan for stores water; Increase the comprehensive utilization benefit of Linhuaigang flood control engineering.
The climate change and Hydrology environmental effect research for Xiaolangdi and Xixiayuan Project Yellow River water & hydropower development parent company Research the local climate effect and Hydrology environmental effect for Xiaolangdi and Xixiayuan reservoir; Ration forecast the climate change and precipitation space-time distribution after built reservoir; Reasonable use reservoir climate resources and hydrology essential, optimized reservoir regulation.
The police study for exportation of water related advance technology Ministry of Water Resources of the People¨s Republic of China Investigation into advanced technique  exports present situation; Analysis exportation technical structure constitution, the superiority and the insufficiency of the domestic advanced technical production; Proposed strengthens the exportation the instruction opinion; Provides the policy, the fund policy-making reference for the government department; Gives the comments for expanded exportation quantity and the quality.

The Consultation on Feasibility Study for Dajiangbian Irrigation area project

Dajiangbian reservoir administration center, Qiyang County , Hunan Province

Consultation on Feasibility Study, Action program. Reviewing the Technical program of the project; Reviewing the dam safety and management program; Finishing the EIA report and water balance report; Suggesting the water saving technology used in the irrigation; Helping the farmers to setup program and action plan on Self Financing Independent Irrigation District

River Course government project in Ming Tombs area Beijing City  Changping borough Environment and Zoology Management Office River Course government, Environment/Economic Analysis, Economic Evaluation, Venture capital evaluation, Feasible program, Compensation
Technical assistance for Jiuduhe Villa Project Beijing Longde Co., Ltd Flood Impact Analysis Report, Water and soil conservancy planning, Environmental impact assessment, Geological risk assessment, Water resources argumentation.
River planning Jianghe River Of  Longkou City, Shandong Province Water Sciences College, Water Business  Board In Longkou (IWRC) Social Economy Development Assessment, Immigration scheme evaluation, Environmental impact assessment, General River Planning consultation recommendations, Water Landscape planning recommendation.
Hydropower assessment Of Jinyatan River Investment Company (HK)

Assessing project for feasibility study, Social impact assessment, Immigration scheme evaluation, Environmental impact assessment, Institution-building and training of personnel.

Study on Wetland and River system ecological protection In Haihe Basin

World Band & National Environment Protection Agency (NEPA)

Study the ecological functions of wetland and river in the river basin, Provide the suggestion on the ecological management, Reviewing the biodiversity plan and technology plan, Calculating the water resources balance.

Technical assistance for management of the Li River

Guilin City Li River Scenic Part Comprehensive Improvement Project Management Office, WB

Confirm and represent the results of this analysis at a stakeholder workshop

Make a time bound action plan for implementation Assist and advise on implementation of the IDP. Draw the rule of law for the LiJiang key point of interest.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


Add: No.12, Lane 2, Baiguang Road, Xuanwu District, Beijing, China      Post code: 100053
Tel: 86-10-63581188-2215    Fax: 86-10-83547572
E-mail: postmaster@riverengineers.com.cn

       
PROJECTS

PARTNER

OPPORTUNITIES