|
Project Title |
Client / Donor |
Key Issues |
|
The budget management regulation study of South-to-North Water
Transfer Project |
Bureau of South-to-North Water Transfer, the Central People's
Government of P. R. China |
Discuss the problems on the budget management of South-to-North
Water Transfer Project; Provide the advice to ^The
Static Control & Dynamic Manage Stratagem ̄ of the budget
management of South-to-North Water Transfer Project. |
|
The cost reviewing and recalculation of Feasibility Study and
Preliminary Design for South-to-North Water Transfer Project |
Yangtze River Water Resources Commission, Ministry of Water
Resources of P.R. of China |
Undertake
cost reviewing and recalculation
of
South-to-North Water Transfer Project¨s Feasibility study and
Preliminary Design; Investigate
and
ascertain the overlap workload of the different investigation
and design work phases (From 1992 to Present). |
|
The law &
regulation study of South-to-North Water Transfer Project |
Bureau of South-to-North Water Transfer Planning & Design,
Ministry of Water Resources of P.R. of China |
Discuss the problems on the law &
statute of South-to-North Water Transfer Project; Gives the
suggestion on perfecting the current law &
statute system of South-to-North Water Transfer Project; Provide
the advice to the government policy-making department. |
|
The risk and social
impact of Lihuangang Flood Control Project |
Huaihe River
Commission Ministry Of Water Resources, P. R. China |
analysis for the
necessity and the feasibility about coming water of Linhuaigang
engineering; Proposed appropriate plan for stores water;
Increase the comprehensive utilization benefit of Linhuaigang
flood control engineering. |
|
The climate
change and
Hydrology environmental effect research for Xiaolangdi and Xixiayuan
Project |
Yellow River water
& hydropower development parent company |
Research
the
local
climate
effect and Hydrology environmental
effect for Xiaolangdi and Xixiayuan reservoir; Ration forecast
the
climate
change and precipitation space-time
distribution after built reservoir; Reasonable use
reservoir climate resources
and hydrology essential, optimized reservoir regulation. |
|
The police
study for exportation of water related advance technology |
Ministry of Water Resources of the People¨s Republic of
China |
Investigation into
advanced technique exports
present situation; Analysis exportation technical structure
constitution, the superiority and the insufficiency of
the domestic advanced
technical production; Proposed strengthens the exportation the
instruction opinion; Provides the policy, the fund policy-making
reference for
the government department; Gives the comments for expanded
exportation quantity and the quality. |
|
The Consultation on Feasibility Study for Dajiangbian Irrigation
area project |
Dajiangbian reservoir administration center, Qiyang County ,
Hunan Province |
Consultation on Feasibility Study, Action program. Reviewing the
Technical program of the project; Reviewing the dam safety and
management program; Finishing the EIA report and water balance
report; Suggesting
the water saving technology used in the irrigation; Helping the
farmers to setup program and action plan on Self Financing
Independent Irrigation District |
|
River Course government project in Ming Tombs
area |
Beijing City Changping borough
Environment and Zoology
Management Office |
River Course government, Environment/Economic Analysis,
Economic Evaluation, Venture capital evaluation, Feasible
program, Compensation |
|
Technical assistance for Jiuduhe Villa
Project |
Beijing Longde Co., Ltd |
Flood Impact Analysis Report, Water and
soil
conservancy planning, Environmental
impact assessment, Geological risk
assessment, Water resources
argumentation. |
|
River planning Jianghe River Of
Longkou City, Shandong Province |
Water Sciences College, Water Business
Board In Longkou (IWRC) |
Social Economy Development Assessment,
Immigration scheme evaluation,
Environmental impact assessment,
General River Planning consultation
recommendations, Water Landscape
planning recommendation. |
|
Hydropower assessment Of Jinyatan |
River Investment Company (HK) |
Assessing project for feasibility
study, Social impact assessment,
Immigration scheme evaluation,
Environmental impact assessment,
Institution-building and training of
personnel. |
|
Study on Wetland and River system
ecological protection In Haihe Basin |
World Band & National Environment
Protection Agency (NEPA) |
Study the ecological functions of
wetland and river in the river basin,
Provide the suggestion on the
ecological management,
Reviewing the biodiversity plan and
technology plan, Calculating the water
resources balance. |
|
Technical assistance for management of
the Li River |
Guilin City Li River Scenic Part
Comprehensive Improvement Project
Management Office, WB |
Confirm and represent the results of
this analysis at a stakeholder workshop
Make a time bound action plan for
implementation Assist and advise on
implementation of the IDP.
Draw the rule of law for the LiJiang
key point of interest. |